Environmental factors influencing construction implementation from contractors’ perspective
##plugins.themes.bootstrap3.article.main##
Abstract
To achieve the project’s goal, both internal and external organization influencing factors (construction industry) should be aware, particularly at the construction implementation level. The objective of this research is to identify the environmental factors that influence construction implementation from the contractor’s perspective as the main actors in the implementation of construction. The methodology used in this research was library research and surveys using questionnaires as data instruments. The analytical method used is principal component analysis, supported by the SPSS program. Based on the analysis results of the environmental factors that influence the construction implementation level using principle component analysis, the total class produced 15 main components and was capable of explaining the various data with a cumulative percentage of 85.672%. From the study results, it can be concluded that the company resource factor was the most influential factor compared with other factors.
Downloads
##plugins.themes.bootstrap3.article.details##
Copyright (c) 2023 Nelda Maelissa, Eko Prihartanto, Anisa Ratnasari
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
References
AboAbdo, S., Aldhoiena, A., and Al-Amrib, H., 2019. Implementing enterprise resource planning ERP system in a large construction company in KSA', Procedia Comput. Sci. 164, 463-70 DOI: https://doi.org/10.1016/j.procs.2019.12.207
Ahmadabadi, A. A., and Heravi G., 2019. The effect of critical suc- cess factors on project success in public-private partnership projects: A case study of highway projects in Iran, Transp. Policy. 73, 152-161 DOI: https://doi.org/10.1016/j.tranpol.2018.07.004
Alaloul, W. S., Liew, M. S., Zawawi, N. A. W. A., and Kennedy, I.B., 2020. Industrial Revolution 4.0 in the construction industry: Challenges and opportunities for stakeholders, Ain Shams Eng. J. 11, 225-30 DOI: https://doi.org/10.1016/j.asej.2019.08.010
Bajjou, M. S., and Chafi, A., 2020. Empirical study of schedule delay in Moroccan construction projects, Int. J. Constr. Manag. 20, 783-800 DOI: https://doi.org/10.1080/15623599.2018.1484859
Budhathoki, S. S., Hawkins, M., Elsworth, G., Fahey, M. T., Thapa, J., Karki, S., Basnet, L. B, Pokharel, P. K., and Osborne, R. H., 2022. Use of the english health literacy questionnaire (HLQ) with health science university students in Nepal: A validity testing study, Int. J. Env. Res. Pub. Health. 19, 3241 DOI: https://doi.org/10.3390/ijerph19063241
Bull, C., Byrnes, J., Hettiarachchi, R., Downes, M., 2019. A system- atic review of the validity and reliability of patient‐reported experience measures, Health Serv Res. 54, 1023-1035 DOI: https://doi.org/10.1111/1475-6773.13187
Gonze, X., Amadon, B., Antonius, G., Arnardi, F., Baguet, L., Beuken, J.-M., Bieder, J., Bottin, F., Bouchet, J., Bousquet, E., Brouwer, N., Bruneval, F., Brunin, G., Cavignac, T., Charraud, J.-B., Chen, W., Côté, M., Cottenier, S., Denier, J., Geneste, G., Ghosez, P., Giantomassi, M., Gillet, Y., Gingras, O., Hamann, D.R., Hautier, G., He, X., Helbig, N., Holzwarth, N., Jia, Y., Jollet, F., Lafargue-Dit-Hauret, W., Lejaeghere, K., Marques, M.A.L., Martin, A., Martins, C., Miranda, H.P.C., Naccarato, F., Persson, K., Petretto, G., Planes, V., Pouillon, Y., Prokhorenko, S., Ricci, F., Rignanese, G.-M., Romero, A.H., Schmitt, M.M., Torrent, M., van Setten, M.J., Van Troeye, B., Verstraete, M.J., Zérah, G., and Zwanziger, J.W., 2020. The Abinitproject: Impact, environment and recent developments, Comput. Phys. Commun. 248, 107042 DOI: https://doi.org/10.1016/j.cpc.2019.107042
Hidalgo, E. S., 2019. Adapting the scrum framework for agile pro- ject management in science: case study of a distributed research initiative, Heliyon. 5, e01447 DOI: https://doi.org/10.1016/j.heliyon.2019.e01447
Iliyasu, R., and Etikan, I., 2021. Comparison of quota sampling and stratified random sampling, Biom. Biostat. Int. J. 10, 24-27 DOI: https://doi.org/10.15406/bbij.2021.10.00326
Kerzner, Harold. 2022. Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance (John Wiley & Sons).
Liu, J., Yi, Y., Wang, X., 2020. Exploring factors influencing construction waste reduction: A structural equation modeling approach, J. Clean. Prod. 276, 123185 DOI: https://doi.org/10.1016/j.jclepro.2020.123185
Ma, M., Cai, W., Cai, W., Dong, L., 2019. Whether carbon intensity in the commercial building sector decouples from economic development in the service industry? Empirical evidence from the top five urban agglomerations in China, J. Clean. Prod. 222, 193-205 DOI: https://doi.org/10.1016/j.jclepro.2019.01.314
Mahmoudi, M.R., Heydari, M.H., Qasem, S.N., Mosavi, A., Band, S.S., 2021. Principal component analysis to study the relations between the spread rates of COVID-19 in high risks countries, Alex. Eng. J. 60, 457-464 DOI: https://doi.org/10.1016/j.aej.2020.09.013
Malara, J., Plebankiewicz, E., and Juszczyk, M., 2019. Formula for determining the construction workers productivity including environmental factors, Buildings. 9, 240 DOI: https://doi.org/10.3390/buildings9120240
Munirathinam, Sathyan. 2020. 'Chapter Six - Industry 4.0: Indus- trial Internet of Things (IIOT).' in Pethuru Raj and Preetha Evangeline (eds.), Advances in Computers (Elsevier) DOI: https://doi.org/10.1016/bs.adcom.2019.10.010
Sohilait, M., Maelissa, N., Rokhim, I., N., and Bhat, S. A., 2022. Ana lysis of the influence of environmental factors on the delay in the construction of Maluku traffic office service building, Environ. Toxic. Manag. 2, 10-13 DOI: https://doi.org/10.33086/etm.v2i3.3555
Sürücü, L., and Maslakci, A., 2020. Validity and reliability in quanti- tative research, Bus. Manag. Stud. Int. J. 8, 2694-2726 DOI: https://doi.org/10.15295/bmij.v8i3.1540
Tetelepta, J., Maelissa, N., and Tuanakotta, A., 2019. An analysis of begin{addmargin}[0.8cm]{0 cm}delay causing factors in implementation of working construction project (case study: Building of the agriculture office in Masohi City, Central Maluku Regency), Int. J. Adv. Eng. Res. Sci. 6, 379-385 DOI: https://doi.org/10.22161/ijaers.611.59
Umar, T., 2018. Causes of delay in construction projects in Oman, Middle East J. Manag. 5, 121-36 DOI: https://doi.org/10.1504/MEJM.2018.091132
Vrchota, J., Řehoř, P., Maříková, M., and Pech, M.,2021. Critical Suc- cess Factors of the Project Management in Relation to Industry 4.0 for Sustainability of Projects, Sustainability. 13, 281 DOI: https://doi.org/10.3390/su13010281
Yap, J. B. H., Goay, P. L., Woon, Y. B., and Martin S., 2021. Revisiting critical delay factors for construction: Analysing projects in Malaysia, Alex. Eng. J. 60, 1717-29 DOI: https://doi.org/10.1016/j.aej.2020.11.021